wait 2007 (forth video in the series) I have a high quality DVD version if anyone would like a copy let me know.
Wednesday, September 26, 2007
OPEN
Still Moving, Andrew Baker Art Dealer, 19th September - 13th October 2007
Gallery 3
the transit of venus
around about, imperfect patterns
the sky silver, imperfect patterns
the sky silver, wing it, imperfect patterns
Gallery 1
new day
new day, imperfect pattern
abridged, new day, imperfect pattern
Gallery 2
helter skelter
bale, imperfect pattern
bale
(all works 2007)
Gallery 3
the transit of venus
around about, imperfect patterns
the sky silver, imperfect patterns
the sky silver, wing it, imperfect patterns
Gallery 1
new day
new day, imperfect pattern
abridged, new day, imperfect pattern
Gallery 2
helter skelter
bale, imperfect pattern
bale
(all works 2007)
Monday, September 03, 2007
news
'Still Moving', an exhibition of new 3D works, is due to open at Andrew Baker Art Dealer, 26 Brookes Street Bowen Hills on the 19th of September, please come and meet the artist (that's me) for drinks from 6:00pm on the 28th of September. A beautiful 40 page catalogue of these new works has been published by Andrew Baker (thank you Andrew) and is available from the galley (and the Gallery Store at QAG).
Tuesday, August 21, 2007
'Yes, there were times, when I had doubts'
As of 5:45 last night SPUN is DONE. It is a times like these (and when love is in the air) that I find myself singing the big numbers to myself, 'I'm still standing', 'I will survive' and ' I did it myyy wayyy'. Yes, 'at first I was afraid, I was petrified', I'm not quite sure what to do with myself now that I don't have to worry about riggers and welders, thankfully the show coming up will soon get me back to work. I will try to organise a little party at Southbank soon so you can all come and see it.
Sunday, July 22, 2007
STILL MOVING
A sneak peek at some work for 'Still Moving', September 2007 at Andrew Baker Art Dealer 26 Brookes Street Bowen Hills. Three of the works from this show will then go on to the ARC Biennial at QUT Art Museum, Gardens Point (don't know which yet) opening in early October.
as yet untitled, 2007, stainless steel wleded mesh, 95 x 56 x 63cm (approx.)
Imperfect Pattern XLI, 2007, matt board, 43 x 32x 6cm
At work on a cold Saturday morning, in my very warm ugg (woops the americans own ugg, and all dirivatives) boots (thank you Leonard).
as yet untitled, 2007, stainless steel wleded mesh, 95 x 56 x 63cm (approx.)
Imperfect Pattern XLI, 2007, matt board, 43 x 32x 6cm
At work on a cold Saturday morning, in my very warm ugg (woops the americans own ugg, and all dirivatives) boots (thank you Leonard).
meanwhile...
Monday, July 09, 2007
delay, delay delay
appologies that I have not updated the blog, things are not exactly going to plan at the moment. The concrete component is complete but the steel fin has been delayed causing all manner of headaches, the work will be complete in due time and it will be magnificent but until such time i will just have to wait.
Thursday, June 14, 2007
Day 3
slow and steady
Day two of installation, rain for the 24 hours after the first day of installation meant a two day delay to our progress, the pieces get larger as they move towars the street end of the work.
View from a first story balcony, as yet I have not been able to get any higher, I look forward to seeing the view from the 6th floor..
View from a first story balcony, as yet I have not been able to get any higher, I look forward to seeing the view from the 6th floor..
Thursday, June 07, 2007
so far so good
Tuesday the 5th of June the first 9 pieces of concrete were installed with less difficulty than I had expected. Tuesday night and Wednesday it rained almost nonstop, the footing is currently under 12cm of water, I am not sure when work will resume, but I am pretty confident when it does the rest (21 pieces to go) will happen without too much trouble.
Mulherin Rigging and Cranes are installing the work and doing a beautiful job. I am just standing around taking photos, trying to look busy and doing my best to stay out of their way.
Mulherin Rigging and Cranes are installing the work and doing a beautiful job. I am just standing around taking photos, trying to look busy and doing my best to stay out of their way.
Monday, June 04, 2007
A Little Support
These are the support units that will hold the
steel 'skin' that is to come.
steel 'skin' that is to come.
each unit has between 4 and 13 pieces that need to be welded up.
there are around 100 support pieces, in 9 different configurations,
some with left hand and right hand variations.
Rocklea Pressed metals are making these and the skin pieces
(The Locker Group are cutting and perforating the 'skin ' pieces in Melbourne,
which will be put together by RPM in Brisbane.)
Friday, May 18, 2007
let the concrete flow free
Monday, March 26, 2007
kept in suspense
Subscribe to:
Posts (Atom)